
INTERCHANGE DESIGN

SR 417 SB Ramp to SR 528 WB Ramp Realignment
Reconstructed existing ramp between two freeway facilities to increase the design speed of the ramp from 40 mph to 60 mph in Orange County.

SR 528 Innovation Way Design Build Criteria Package
Design/build criteria package for a new interchange consisting of the addition of five ramps (including one loop ramp)