top of page
INTERCHANGE DESIGN
SR 417 SB Ramp to SR 528 WB Ramp Realignment
County:
Orange
Central Florida Expressway Authority
Client:
Reconstructed existing ramp between two freeway facilities to increase the design speed of the ramp from 40 mph to 60 mph in Orange County.
Also widening 0.5 miles of SR 528 to complete the auxiliary lane to the Narcoosee Road interchange. Tasks included determining the right-of-way impacts and coordinating the right-of-way purchase at two locations in the same parcel as well as signing and pavement marking, including the guide sign design for six separate sign panels (two overhead sign structures and two multi-post ground mounted signs). Included impacts to wetlands, utilities, and the coordination of unexploded ordnance detection on the project site.
bottom of page