top of page

INTERCHANGE DESIGN

Interchange Icon

SR 528 Innovation Way Design Build Criteria Package

County:

Orange

Central Florida Expressway Authority

Client:

Design/build criteria package for a new interchange consisting of the addition of five ramps (including one loop ramp)

Project is on/off SR 528, two ramp bridges over the proposed All Aboard Florida (AAF) railway, and the overpass of Innovation Way over SR 528 and the AAF track. TBG is responsible for the design of the horizontal and vertical geometry for all ramps, designing superelevation transitions for reverse curves, layout of MSE wall locations, layout of resurfacing limits along SR 528 and demolition of existing ramps at Monument Parkway.

The Balmoral Tree Photo Edited.jpg
TBG Logo with transparent background.png

Phone: (407) 629-2185

​Address: 165 Lincoln Ave, Winter Park, FL 32789

The knowledge you need, the integrity you trust.

TM

© Copyright TBG
bottom of page