top of page

Posts

FDOT District Three SR 77

The proof is in the pavement! Check out the before and after for this project in FDOT District Three, designed by TBG’s Roadway/Drainage crew. Improvements for this project included pedestrian pathway connectivity, milling and resurfacing, drainage upgrades, and signalization and lighting upgrades. This project is under our Safety Pillar



0 comments
bottom of page