May 3, 2019Bratt Road over Canoe CreekUpdated: Apr 30, 2021The Bratt Road bridge is currently under construction. The Balmoral Group provided assistance on the Bridge Hydraulics Report (BHR) and drainage design as well as preparation of drainage plans for Bratt Road over Canoe Creek.IMG_5085IMG_5076IMG_5083IMG_5079IMG_5082IMG_5081
The Bratt Road bridge is currently under construction. The Balmoral Group provided assistance on the Bridge Hydraulics Report (BHR) and drainage design as well as preparation of drainage plans for Bratt Road over Canoe Creek.IMG_5085IMG_5076IMG_5083IMG_5079IMG_5082IMG_5081