INTERSECTION IMPROVEMENTS
SR 77 (Main Street) at CR 273 (South Boulevard)
County:
Washington County
FDOT District Three
Client:
This project consisted of the addition of eastbound and westbound turn lanes for the widening of CR 273.
The project also included pavement resurfacing, addition of curb, gutter and sidewalk along CR 273 and SR 77, upgrade of the drainage system along CR 273 to alleviate flooding, signing, pavement marking, replacement of the existing strain pole signal with mast arms, addition of intersection lighting for pedestrians. The project required right-of-way acquisition, and design challenges included contamination within the intersection, involvement with numerous utilities, and avoidance of impacts to adjacent businesses. TBG supported the District with Utility Coordination and Public Involvement efforts.